Miracampestre I
First phase of the Miracampestre development, 300 metres from the Troncal del Caribe highway and 200 metres from the Avenida del Libertador extension.
The project
Miracampestre I
Miracampestre sits 300 metres from the Troncal del Caribe highway, reached through the Urbanización Nevada and Sierra Adentro entrance, and just 200 metres from the extension of Avenida del Libertador.
2010 – 2012Period
Location
Miracampestre development, Santa Marta
Constructora Java’s role
Construction manager and shareholder
Gallery
Miracampestre I in pictures
Completed and delivered
This project has been built and delivered
Miracampestre I was completed in 2010 – 2012. If you are looking for a home or want to bring us a build, let’s talk.
